LESSON 2
PERFORM OPERATOR MAINTENANCE ON THE M157 SMOKE GENERATOR SYSTEM
Critical Task: 031-508-1069
LESSON DESCRIPTION:
Once you have learned the characteristics and uses of mobile smoke and the M157 Smoke Generator
System, you will learn how to perform the operator-level maintenance necessary to prepare the M157
Smoke Generator System for operation. To prepare the system for operation, you must be able to
perform maintenance on the --
M54 Smoke Generator.
Fog oil tank assembly.
Fog oil pump assembly.
Control panel assembly.
ACTION: Perform operator-level maintenance on the M157 Smoke Generator System.
CONDITION: Given information about and illustrations of the performance of operator-level
maintenance on the M157 Smoke Generator System.
STANDARD: Demonstrate competency in the skills and knowledge of the task by responding to the
multiple-choice test covering the performance of operator-level maintenance on the M157 Smoke
Generator System.
REFERENCE: TM 3-2040-279-12&P.
INTRODUCTION
This lesson covers the performance of operator maintenance on the M157 Smoke Generator System.
You will learn the specifics for operator maintenance for the M54 Smoke Generator, the fog oil tank
assembly, the fog oil pump assembly, the air compressor assembly, and the control panel assembly.
2-1
CM3305