Lesson 2
LESSON 2
PERFORM OPERATOR PREVENTIVE
MAINTENANCE ON THE 50-GPM PUMP
TASK
Perform operator preventive maintenance on the 50-GPM Pump.
CONDITIONS
Given information about and diagrams of the procedures for performing before-operation, during-
operation, and after-operation checks on the 50-GPM Pump, and preparing DA Form 2404
(Equipment Inspection and Maintenance Worksheet).
STANDARDS
Demonstrate competency of the task skills and knowledge by responding to the multiple-choice
test covering procedures for performing before-operation. during-operation, and after-operation
checks on the 50-GPM Pump.
REFERENCES
TM 5-2805-256-14
TM 5-4320-200-15
TM 38-750
17